Despite the size constraints of the Upper Road site, this week we managed to squeeze in a 35 ton crane and the erection of the Timber frame is now well under way.
Ground floor walls and first floor cassettes are being installed while the scaffolders start on the tubing for the 3rd lift which will be used to land the roof next week.