This week the timber frame specialist Oregon completed the final stages of the timber frame erection to both plots.
The following explains the process:
Once all Lifting Plans, Risk Assessments and Method Statements had been completed the 50 ton crane was positioned on site.
The roof which had been assembled on the ground floor ceiling was slowly lifted off the building and positions on a lay down area on site.
Once the 1st floor walls are completed the roof is then lifted back up and landed on the walls.
The whole operation is planned meticulously and executed with expert precision but can be cancelled with the shortest of notice if the weather conditions are not optimum, fortunately for the Upper Road Project all went to plan and the Roof Covering begins next week.