Friday, 2 November 2012

The concrete foundations are now complete, although the excavations ended up being rather larger than hoped, due to the building that previously sat on the site being demolished.

The neighbouring land owner has kindly allowed us to use an area of his land, up to Christmas, so that the timber frame materials can be stored ready for erection, which has helped due to the tight nature of the site.

The concrete floor will be getting installed over the next couple of weeks with the scaffold and timber frame to follow.